Anita’s test Page

ECC Project Submittal Process
First
Last
Pine Mountain Lake Association Environmental Control Committee:
Suzette Laffranchi Community Standards Director
The Environmental Control Committee and Pine Mountain Lake Association assumes no responsibility for missing, dislocated or misidentified property pins. We strongly advise that you obtain a survey of your lot to verify property pin location prior to breaking ground.
If property pins are missing or misplaced which are required to determine compliance with the front, side and/or rear setback requirements, the Environmental Control Committee suggests, and may require that a State Licensed Land Surveyor determine the proper location of the pins in question.
3. At the time of Plan Submittal, all property pins must be located, flagged, and property lines strung. The proposed structure outline must also be staked be cut prior to approval. In NO case shall it be the responsibility of Pine Mountain Lake association or the Environmental Control Committee to locate or certify location of property pins. The stringing of the property to establish the acceptable location of the Improvement will be verified as part of the first inspection.
I acknowledge that all the information submitted herein is factual.
If any of this information changes, ECC will be notified prior to the changes made.
Location of property pins & setback requirements are the responsibility of the owner or their agents.
ECC and PMLA assumes no responsibility for miss-marked property pins and strongly suggest hiring a Surveyor.
PML road, curb, drainage, etc.. will be repaired to a standard accepted by PML.
The Plan check fee covers 4 inspections on a new home.
Additional inspections will be charged per current Fee Schedule.
Maximum upload size: 516MB
Maximum upload size: 516MB
Maximum upload size: 516MB
ECC@pinemountainlake.com
Person filling out form: *