The following is information and photos regarding the renovation of the Bar, Restaurant, Kitchen, Outside Deck area at the Grill facility. After months of review and member input, the original plan to renovate the 19th Hole Lounge (Bar) at the Grill was updated to include the rest of the facility. All areas of the building were in need of renovation and the Board decided to move in this direction to save money by doing the project all at once rather than piecemeal. Funding for this project came out of Association reserves. The Board of Directors held several meetings to discuss the project, took member input and finalized and approved the design and chose a general contractor. The demolition was completed and the contractor found several issues with the electrical, mechanical, HVAC ducting and plumbing systems. As a result, these have all been replaced. Our contractor completed installation of all components and fixtures and we are performing the remainder of the finish work. We have opened the Bar and have been holding training dinners and working with staff to get our facility back to normal operations and we look forward to completion so that members can enjoy our newly renovated amenity. This should all happen soon.
[fvplayer id="1"][fvplayer id="2"]
New Progress Pictures 5/22/2019
Demo Days

Demo Days

Demo Days

New walk-ins

New Brick Oven

Kitchen wall tile

Tile Entry

New Bar

New flooring

June 6th 2019 Progress
Outside Deck

New Windows

Dinning Room to Bar

Server Station & Cook Area

New Kitchen

New Kitchen Equipment

June 13th 2019 Progress
Kitchen Equipment Installed

Bar to Dinning Room

Pizza Oven Installed

Dinning Room to Bar

Entry

Server Station & Cook Area

July 12, 2019 Progress
Dining Room

New Bar

Dining Room

Kitchen & Pizza Oven

Dining Room

New Kitchen

Booths in Dining Room

Banquet Room

Bar Seating

Banquet Room